Jane Styckle Cyber Block Party, Week 40. G5, E13, F5, F6 and TR7 (M)
#21
Super Member
Join Date: Sep 2009
Location: Massachusetts, USA
Posts: 1,775
Originally Posted by sandpat
But Cathy...you wouldn't be alone...you'd have all of us to whine too..I mean we're here to support you :wink:...but thanks for the compliment
#22
Super Member
Join Date: Sep 2009
Location: Massachusetts, USA
Posts: 1,775
Originally Posted by Lacelady
Originally Posted by QuiltswithConvicts
Originally Posted by sandpat
My hats off to you Kathy....and you better hurry!!!! We had a our 1st frost night before last. It was a light one, but still....I suppose you are using different fabs for your "between" tris...
I should be basting before the end of the month if the triangles go together well. Yes, they are fabrics that appeared in the squares, and will make an encore appearance in the triangles. Will do a cutrain call for the alternating sloid fabric tris. Must lay it all out so I don't have the same fabric close to itself anywhere!
#23
Originally Posted by cabbagepatchkid
Originally Posted by Lacelady
Originally Posted by QuiltswithConvicts
Originally Posted by sandpat
My hats off to you Kathy....and you better hurry!!!! We had a our 1st frost night before last. It was a light one, but still....I suppose you are using different fabs for your "between" tris...
I should be basting before the end of the month if the triangles go together well. Yes, they are fabrics that appeared in the squares, and will make an encore appearance in the triangles. Will do a cutrain call for the alternating sloid fabric tris. Must lay it all out so I don't have the same fabric close to itself anywhere!
#24
Power Poster
Thread Starter
Join Date: Sep 2007
Posts: 18,726
Cathy, feel free to jump right in or you could start at the beginning. The summer weeks were the easy ones, right now they are getting hard again. The beginning weeks started out pretty easy. The schedule that we were using is posted by Klue on the main Dear Jane Cyber Block Party Thread. We'll be around here to help you, admire your work, offer assistance and of course to listen to you whine if you need to..:D:
#25
Cathy, just to let you know the first schedule printed on the main thread for this DJ is incorrect but will give you an idea of the schedule we are all working to. I think the corrected version is on page 187 or there abouts.
Jump right in and join us. You can always go back and do the blocks at the beginning later.
Elle
Jump right in and join us. You can always go back and do the blocks at the beginning later.
Elle
#27
Here are my last 2 corners. Now to lay out all triangles for border & sew together. It was 88° here yesterday, so I may make my deadline of finishing top before the first frost.
3rd Corner Finished
[ATTACH=CONFIG]112965[/ATTACH]
Last Corner finished
[ATTACH=CONFIG]112966[/ATTACH]
Rat's nest before pressing
[ATTACH=CONFIG]112968[/ATTACH]
Thread
Thread Starter
Forum
Replies
Last Post
Janstar
Blocks of the Month and Week
52
10-30-2011 04:23 PM
sandpat
Blocks of the Month and Week
97
05-09-2011 06:10 AM
sandpat
Blocks of the Month and Week
26
10-14-2010 05:25 AM
Lacelady
Blocks of the Month and Week
56
10-12-2010 04:01 PM
Lacelady
Blocks of the Month and Week
89
06-17-2010 06:40 AM