Originally Posted by BlueChicken
It actually doesn't start till the 4th of January, klue is just making sure it's all ready to go before that date. So, plenty of time to join in still! ;-)
And there's no pressure to keep up either, although there is a large incentive by way of a fabric prize drawn every six weeks or so. But there's no reason you can't pick just one or two blocks out of each schedule to do if you want to join in. It's going to be a lot of fun, and an awesome thing to be a part of. :-) Now to find the software........since I already have EQ6. |
Originally Posted by Maribeth
Kelly, please take my name off of the DJ list. I don't think I will be able to keep pace with y'all at this time. I received a few more orders for memory pillows and another quilt or maybe two (when I priced it out for this friend of a friend she said she would need to think about it before making deposit) and I need to finish most of these by the end of January. May try to follow-up with you then. Will still be reading to see all you have done. Take Care, Maribeth
come May 2011, some will have finished quilting and binding and others will be finished with the tops. its the process of making it with friends that matters not the speed to completion. |
Originally Posted by b.zang
Originally Posted by BlueChicken
It actually doesn't start till the 4th of January, klue is just making sure it's all ready to go before that date. So, plenty of time to join in still! ;-)
And there's no pressure to keep up either, although there is a large incentive by way of a fabric prize drawn every six weeks or so. But there's no reason you can't pick just one or two blocks out of each schedule to do if you want to join in. It's going to be a lot of fun, and an awesome thing to be a part of. :-) Now to find the software........since I already have EQ6. i'm sure many people will be ahead and behind at various times during the next 18 months. i'm the only person who can't fall behind the schedule :shock: the tutes will be on the forum - they won't be taken down for sometime, if ever. |
Originally Posted by kluedesigns
i'm the only person who can't fall behind the schedule :shock:
You're a machine, and besides, sleep is over rated ;-) |
Originally Posted by kluedesigns
i'm the only person who can't fall behind the schedule :shock:
Besides, you SET the schedule, didn't you? |
Originally Posted by kluedesigns
thats the beauty of this not being a "swap" you can just jump in and out as time permits.
Come May 2011, some will have finished quilting and binding and others will be finished with the tops. Ok, then I will try to get caught up, but I will be starting about three weeks behind. I have to finish these other projects first. Apparently, I am better then I thought, :D the memorial quilt and pillows I made for friends were very popular Christmas presents and I have a few orders. |
Originally Posted by kluedesigns
turns out i can't send out a group PM to everyone letting them know that tutes and pics are up.
i'm slowly working my way thru the list of people who've signed up but if you guys happen to chat with others let them know the tutes are in the tute section and the pics are in the pic section. i've sent to shemjo already because i know she never gets notifications. I sure hope my background fabric comes in soon. I may have to make a block or two and call it "practice."
Originally Posted by BlueChicken
It's the best bit about summer.... man cooking! LOL
|
Originally Posted by Tiffany
Originally Posted by BlueChicken
It's the best bit about summer.... man cooking! LOL
|
1 Attachment(s)
well, I was about to start the first triangle, but I'm thinking perhaps I should take a few minutes to tidy my dungeon....
What can I say, I've been busy! LOL [ATTACH=CONFIG]60970[/ATTACH] |
Originally Posted by BlueChicken
Originally Posted by kluedesigns
i'm the only person who can't fall behind the schedule :shock:
You're a machine, and besides, sleep is over rated ;-) |
All times are GMT -8. The time now is 02:27 PM. |