How Many UFO's do you have???
#102
I am down to just two that are ready to go on my frame. One ready for binding. One embroidered quilt as you go block a month (On block 1) Another applique quilt as you go (On block 2). Just bought fabric yesterday for 2 Attic Windows and a strip quilt. Not to mention little gifts I am making as give aways at our April fashion show and a purse for me. (So why am I setting here typing?) Had to take a break and do laundry. Yuck!
#103
I am down to just two that are ready to go on my frame. One ready for binding. One embroidered quilt as you go block a month (On block 1) Another applique quilt as you go (On block 2). Just bought fabric yesterday for 2 Attic Windows and a strip quilt. Not to mention little gifts I am making as give aways at our April fashion show and a purse for me. (So why am I setting here typing?) Had to take a break and do laundry. Yuck!
#104
Banned
Join Date: Oct 2009
Location: Ephrata, WA
Posts: 8,802
right now I have 7. Those are projects that I have started and not finished....i am slowly working on them. However I have 100's of ideas and someday quilts that I want to do?? I will probably have all of my UFO's done before summer because most of them are scrap quilts that just need to be sewn together.
#105
What is the difference between a UFO and a WIP? And what about all the "thingys" that you have planned but not cut, but everything is in one spot. What are they? I'm not sure how many I have as I keep finding things I forgot about. Know that doesn't happen to any of you :lol: :lol: :lol:
#106
Originally Posted by Olivia's Grammy
What is the difference between a UFO and a WIP? And what about all the "thingys" that you have planned but not cut, but everything is in one spot. What are they? I'm not sure how many I have as I keep finding things I forgot about. Know that doesn't happen to any of you :lol: :lol: :lol:
I've got 2 quilt tops finished and have decided to take them to a quilter instead of tackling them on my own. The king-size is just too big for me to handle on my home sewing machine. The other is embroidered and I can't decide how to have it quilted. Other than that, I have fabric for at least 6 projects waiting in the wings. One of those is a baby quilt for a shower in April, so that one will move to the top of the list as soon as I'm done quilting my sister's quilt (this weekend, I hope).
#108
In the past 8 months I have finished and sent on to new homes 12 lap quilts. I have 8 tops here to get layered and quilted and I have in the works right now two more tops.
I don't let myself start another project until I've battled my way through at least one of the UFOs.
I don't let myself start another project until I've battled my way through at least one of the UFOs.
#109
I seem to have stalled. Made 2 aprons, and am working on 2 sweartshirt jackets for my DGD, none of whick are UFO's. I have a customers denim quilt waiting to be loaded and quilted, and my Feb. UFO is laughing at me, can you hear it?
Thread
Thread Starter
Forum
Replies
Last Post
craftybear
Main
25
09-18-2011 03:23 PM