I have to be crazy...there's no other explanation....
#84
Super Member
Join Date: Jul 2010
Location: Lebanon Missouri
Posts: 2,668
Quilts in progress-3 baby - 2 queen -2 lap and some how I got roped into making a reversible hanging bassinet thingy one side pink the other blue and I still have to get 2 more queens which I haven't even shopped for yet due for Christmas. And here I am on the computer my brother said 'shouldn't you be sewing' -I replied I'm working on perfecting my Procrastinator Gene- Oh I forgot I also have to cut and prepare blocks for a baby shower then make the quilt-I need a couple clones
#85
I have 5 UFO's waiting to be finished, but the silliest thing I have done recently was tearing my newly remodeled room apart yesterday looking for my attachment box. For the longest time it was on the shelf under the table. When I gave up and started sewing I realized the attachment box is part of my machine and I had put it back on the machine. Still haven't admitted it to my husband, who did wander in the room and took a look before he fled.
:oops:
:oops:
#88
Senior Member
Join Date: Apr 2011
Location: Ohio
Posts: 952
Sounds pretty crazy.....to anybody who does not quilt. I currently have one quilt being hand quilted on a frame in my quilt room, 2 baby quilts (waiting to find out if they are boys or girls) ready to begin on, a patriotic quilt in the piecing stage, and a "quilt to go" in sections that I can hand quilt in the evening sitting beside the DH. And they say we quilters can't multitask!!!!!!
#90
You are not the only one that finishes 1 project before starting a new one. Guess I can't multi-task as well as a lot of you. I'm going to try more than one at a time and see if I succeed. I spend too much time on the QB-maybe my biggest problem. Enjoy it though.
Thread
Thread Starter
Forum
Replies
Last Post
JUNEC
General Chit-Chat (non-quilting talk)
14
03-27-2010 08:50 AM
butterflywing
General Chit-Chat (non-quilting talk)
0
12-26-2009 02:43 PM