Go Back  Quiltingboard Forums >
  • Main
  • Pinwheel Project to start Feb 10, 2011  NEW >
  • Pinwheel Project to start Feb 10, 2011 NEW

  • Pinwheel Project to start Feb 10, 2011 NEW

    Thread Tools
     
    Old 03-31-2011, 02:44 PM
      #1231  
    Super Member
     
    Join Date: Nov 2007
    Location: Rhode Island
    Posts: 8,943
    Default

    Originally Posted by capucine
    Thank you Blue Bell the runner will be going to my cousin in Mauritius hope she likes it :)

    Originally Posted by Blue Bell
    Love your runner, Capucine. Great fabric selection and a great way to use up a single block.
    If your cousin doesn't like it, please send it to me. I love your runner.
    Blue Bell is offline  
    Old 03-31-2011, 11:40 PM
      #1232  
    Super Member
     
    dhanke's Avatar
     
    Join Date: Jan 2011
    Location: Grand Junction, CO
    Posts: 1,452
    Default

    Too much work, not enough quilting time, I didn't meet my goal of finishing the quilting yet, maybe by Sunday.
    dhanke is offline  
    Old 04-01-2011, 11:44 AM
      #1233  
    Super Member
     
    Floralfab's Avatar
     
    Join Date: Dec 2010
    Location: Massachusetts
    Posts: 2,957
    Default

    Very pretty!
    Floralfab is offline  
    Old 04-01-2011, 04:33 PM
      #1234  
    Super Member
    Thread Starter
     
    Join Date: May 2008
    Location: Florida
    Posts: 3,708
    Default

    OK, now today is day 50!

    Anyone else getting them done?

    :-D
    susiequilt is offline  
    Old 04-02-2011, 12:24 AM
      #1235  
    Super Member
     
    dhanke's Avatar
     
    Join Date: Jan 2011
    Location: Grand Junction, CO
    Posts: 1,452
    Default

    I finished the straight line quilting at 1 am, I've been sitting here browsing ever since! Time to go to bed, I have to work tomorrow!! I'll start the fmq on Sunday, may not get it finished, but I'll put forth a valiant effort.
    dhanke is offline  
    Old 04-02-2011, 07:01 PM
      #1236  
    Super Member
    Thread Starter
     
    Join Date: May 2008
    Location: Florida
    Posts: 3,708
    Default

    Day 51!
    How's it going?
    :-D

    nag, nag, nag.
    susiequilt is offline  
    Old 04-02-2011, 07:26 PM
      #1237  
    Super Member
     
    Join Date: May 2010
    Location: Southeast Idaho
    Posts: 3,208
    Default

    Originally Posted by dhanke
    I finished the straight line quilting at 1 am, I've been sitting here browsing ever since! Time to go to bed, I have to work tomorrow!! I'll start the fmq on Sunday, may not get it finished, but I'll put forth a valiant effort.
    Those valiant efforts do add up. Looking forward to seeing your creation.
    SandyinZ4 is offline  
    Old 04-03-2011, 12:04 AM
      #1238  
    Senior Member
     
    capucine's Avatar
     
    Join Date: Oct 2010
    Location: Ulladulla, Australia
    Posts: 592
    Default

    How long do we have to finished the project? The backing i bought wasn't enough i am hoping to buy more tomorrow :)



    Originally Posted by susiequilt
    Day 51!
    How's it going?
    :-D

    nag, nag, nag.
    capucine is offline  
    Old 04-03-2011, 01:20 AM
      #1239  
    Super Member
     
    plainpat's Avatar
     
    Join Date: Jan 2009
    Location: Mid-West
    Posts: 3,838
    Default

    I love seeing all the projects.Each one is just so pretty!
    plainpat is offline  
    Old 04-03-2011, 05:25 AM
      #1240  
    Super Member
    Thread Starter
     
    Join Date: May 2008
    Location: Florida
    Posts: 3,708
    Default

    April 30th is the pinwheel finish day! That gave us 78 days for 78 pinwheels.
    Each person was to decide how many blocks they wanted. Some needed less and some needed more.
    The goal was just for the top, not the quilting or binding but some have made that their goal to get the whole thing finished in 78 days.
    My job is to encourage all to get the top done and not have another UFO top!
    We had over 200 people sign up but I don't know how many of those are still working. I hope lots of them are working but not posting.
    I'm still plugging along with mine. I have the pinwheels done that I need and I am putting it together now with the other blocks.
    Slow but sure is what I am doing.
    It sounds like you have your top done so you have met your goal with that part! yeah!! You can set a new goal of April 30th to get it sandwiched and done!





    Originally Posted by capucine
    How long do we have to finished the project? The backing i bought wasn't enough i am hoping to buy more tomorrow :)



    Originally Posted by susiequilt
    Day 51!
    How's it going?
    :-D

    nag, nag, nag.
    :-D :-D :-D
    susiequilt is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    Elisabrat
    Member Swaps and Round/Row Robins
    128
    02-21-2014 01:09 PM
    brushandthimble
    Main
    38
    10-11-2011 01:30 PM
    Twisted Quilter
    Member Swaps and Round/Row Robins
    82
    04-04-2011 03:34 PM
    trupeach1
    General Chit-Chat (non-quilting talk)
    864
    03-02-2011 08:52 PM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter