My first ever completed block ...
#92
Junior Member
Thread Starter
Join Date: Sep 2011
Location: A Yorkshire Brit living in Southern Sweden
Posts: 113
Week 43 and Tomte block 5
I had really hoped to do two each week but perhaps if I keep putting the week numbers on (as is common in Scandinavia) then I will realise that nine blocks and the quilting need to be done by week 50!
I had really hoped to do two each week but perhaps if I keep putting the week numbers on (as is common in Scandinavia) then I will realise that nine blocks and the quilting need to be done by week 50!
Tomte block 5
[ATTACH=CONFIG]279249[/ATTACH]
#93
Junior Member
Thread Starter
Join Date: Sep 2011
Location: A Yorkshire Brit living in Southern Sweden
Posts: 113
I have found it quite difficult to find time to sew, and to be honest the energy/motivation and yet I enjoy it when I do get down to it!
I also discovered that I had the wrong side of the grey framing material upwards on three of the frame sections ... all unpicked and resewed now!
Blocks 6 and 7 are done and block 8 is on the way ... but time is ticking away all too quickly.
Helen
I also discovered that I had the wrong side of the grey framing material upwards on three of the frame sections ... all unpicked and resewed now!
Blocks 6 and 7 are done and block 8 is on the way ... but time is ticking away all too quickly.
Helen
Thread
Thread Starter
Forum
Replies
Last Post
Blue's quilting mama
Pictures
20
10-21-2011 03:31 PM