Go Back  Quiltingboard Forums >
  • Main
  • QuiltingBoard Challenges & Contests
  • UFO Challenge of the Month 2012 >
  • UFO Challenge of the Month 2012

  • UFO Challenge of the Month 2012

    Thread Tools
     
    Old 04-29-2012, 04:32 PM
      #1041  
    Power Poster
     
    Join Date: Jul 2009
    Location: Between the dashes of a tombstone
    Posts: 12,716
    Default

    Originally Posted by wildyard
    You all are simply amazing with so many finishes. Instead of finishes, I have 3 more starts! What is wrong with that picture? I am going backwards here. Guess my one finish for April is going to be it and I am going to have to get my behind in gear for May! I have 3 must dos for May; the pink ribbon, the beach comfort quilt and the wedding calendar quilt. Sadly, only the wedding quilt is a UFO. LOL. The pink ribbon is only a procrastination. I have 9 of the 12 calendar blocks done so far. Today I designed and started cutting squares for the beach comfort quilt. I'm excited about the design I came up with.
    We must be cut from the same cloth
    oksewglad is offline  
    Old 04-29-2012, 05:21 PM
      #1042  
    Super Member
     
    Join Date: Apr 2010
    Location: Brady TX
    Posts: 6,613
    Default

    Originally Posted by oksewglad
    We must be cut from the same cloth
    Me too!
    dublb is offline  
    Old 04-29-2012, 06:45 PM
      #1043  
    Senior Member
     
    Sherryquilts's Avatar
     
    Join Date: Sep 2010
    Location: Kasson, Minnesota
    Posts: 347
    Default

    Originally Posted by dublb
    Me too!
    This seems to be what I do as well - but that's ok!
    Sherryquilts is offline  
    Old 04-30-2012, 05:12 AM
      #1044  
    Super Member
     
    brushandthimble's Avatar
     
    Join Date: Sep 2009
    Location: North of Boston, MA, USA
    Posts: 3,524
    Default

    I also have 3 new starts, all requested by family, DH and 2 DGD's. Those 2 are smallish. Do have an April finish, now to plan on a May finish
    brushandthimble is offline  
    Old 04-30-2012, 07:25 AM
      #1045  
    Super Member
     
    Fraew's Avatar
     
    Join Date: Aug 2011
    Location: Clayton, CA
    Posts: 2,022
    Default April UFO finish - The Lion and the Lamb

    If I could only get out of the 1990s! I must have started a bazillion things between 1995 and 2000 and finished none of them! Thank goodness we have each other.

    Pattern: March Mascots - Lion & Lamb - Quiltmaker Magazine March/April 1999
    Started in 1999, finished at 1am today. Off to the LAQ. Yippie.
    Attached Thumbnails lion-lamb.jpg  
    Fraew is offline  
    Old 04-30-2012, 07:32 AM
      #1046  
    Super Member
     
    QuilterMomma's Avatar
     
    Join Date: Jan 2011
    Location: Eastern Washington
    Posts: 6,514
    Default

    That is so cute. I love that. Great job Fraew.
    QuilterMomma is offline  
    Old 04-30-2012, 07:36 AM
      #1047  
    Super Member
     
    QuilterMomma's Avatar
     
    Join Date: Jan 2011
    Location: Eastern Washington
    Posts: 6,514
    Default

    Here is my #8 finish for April. I probably won't have anymore since it is the last day of the month and no time left. This was a swap last year and I just now finished it. Can't seem to get the camera going, needs new battery charger so took with my phone. I did an edge to edge design called Vanilla Orchid. Love how it turned out. I used King Tut Raspberry color on top and a Razzle Dazzle pink varigated in the bobbin. I also used wool batting so very soft. Love it.
    Attached Thumbnails spring-flowers-2.jpg   spring-flowers-q.jpg   spring-flowers.jpg  
    QuilterMomma is offline  
    Old 04-30-2012, 01:07 PM
      #1048  
    Senior Member
     
    thomp116's Avatar
     
    Join Date: Mar 2011
    Location: Southwest New York
    Posts: 682
    Default

    Loving all the finishes......I've got three table runners and a candle mat for April, but that's all. Had a few starts myself, so we must all be cut from the same cloth!
    thomp116 is offline  
    Old 04-30-2012, 01:36 PM
      #1049  
    Super Member
     
    Join Date: Apr 2010
    Location: Brady TX
    Posts: 6,613
    Default

    Fraew & QM; Great finishes! Love that Lion & Lamb. I got 2 done in 4 months, Ya'll are doin' great! Ring the bell & sing the songs!
    I'm gonna catch up on my PC blocks then start on my DSis's 10 min block quilt.
    dublb is offline  
    Old 04-30-2012, 01:49 PM
      #1050  
    Super Member
     
    Join Date: Apr 2010
    Location: Snellville, Ga & Hiawassee
    Posts: 1,994
    Default

    Great job everyone!
    Wildyard, I'm in the same row boat . Have been gone most of April but did finish quilting my BOM from last year just today. Now to do the binding. So I'm claiming it for April. Will post picture later.
    We'll be gone 1/2 of May too but for fun stuff
    mimiknoxtaylor is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    asimplelife
    QuiltingBoard Challenges & Contests
    491
    12-06-2014 06:06 AM
    SulaBug
    Blocks of the Month and Week
    153
    06-03-2012 11:55 AM
    pollyjvan9
    Main
    22
    12-15-2011 06:41 AM
    LucyInTheSky
    Main
    879
    01-14-2011 11:49 AM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is Off
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter