Virtual Quilting Weekend--Sept 2-5, 2022
#12
Super Member
Join Date: Jan 2015
Posts: 2,867
Thank you for doing this. I have a baby quilt on the piecing machine and a wedding quilt on the FMQ machine, so I have plenty to keep me busy. Actually, two baby quilts - I cut double what I needed.
I have to make myself do my least favorite part of quilting today. Pressing a large back and quilt top to layer them. I don't mind the layering and pinning, but dislike pressing large pieces. 'Just do it.'
I have to make myself do my least favorite part of quilting today. Pressing a large back and quilt top to layer them. I don't mind the layering and pinning, but dislike pressing large pieces. 'Just do it.'
#13
Super Member
Join Date: Jan 2013
Location: Florida
Posts: 3,845
Woo Hoo! Love VQW. Hi All. Good to hear from you. And look forward to pix.
1. very first goal is to figure out posting pics from iPad. QB part is ok.
2. Organize a series that started in a dream and continued to a day dream. This is real progress, the first art since moving.
3. Make a wrap for sitting in a cold church building. Maybe it’s the difference of hot/humid Florida outside to comfort inside.
4. Progress on daughter’s wall hanging.
Yesterday finished a small detailed wall hanging from a prize at guild. 6 hours finishing. Get to start fresh today.
Already have UFO sandwich ready for guild on Thursday.
1. very first goal is to figure out posting pics from iPad. QB part is ok.
2. Organize a series that started in a dream and continued to a day dream. This is real progress, the first art since moving.
3. Make a wrap for sitting in a cold church building. Maybe it’s the difference of hot/humid Florida outside to comfort inside.
4. Progress on daughter’s wall hanging.
Yesterday finished a small detailed wall hanging from a prize at guild. 6 hours finishing. Get to start fresh today.
Already have UFO sandwich ready for guild on Thursday.
#14
Super Member
Join Date: Oct 2011
Location: South Central Indiana
Posts: 1,931
Hi everyone! Not sure how much sewing I will get done this weekend. We are starting a demo of my daughter's kitchen. The cabinets are on order, but we are taking out a small pantry and extending a wall. And that has to be done before cabinets. Also have to move some outlets and the water line for the icemaker.
If I get to sew, there are many projects vying for my attention... some quilted hearts (IFAQH.com), a jelly roll veteran quilt, and binding for 5 other vet quilts.
If I get to sew, there are many projects vying for my attention... some quilted hearts (IFAQH.com), a jelly roll veteran quilt, and binding for 5 other vet quilts.
#15
Super Member
Join Date: Jan 2014
Location: Central NM
Posts: 1,600
Goal is to have fab room all cleaned/cleared out for DS. We're 95% done which is the hard part. Just tried of he whole process.Moing the fab was a hoot. Thought of projects to do with so many pieces. Decided NOT to jot them down and just keep "moving".
I know what's going to happen. Finding that ONE fab...will say to self...I know where it was before I moved everything here! Right?
I know what's going to happen. Finding that ONE fab...will say to self...I know where it was before I moved everything here! Right?
#18
This is the dress and wrap project.Attachment 640376
By the way, what is the pattern number. I like what little of it that I see.
Janey - Neat people never make the exciting discoveries I do.
#20
Nice dress. I don't sew much in the way of clothing anymore, and sure wish the mending would disappear too.
I am quite proud of myself. I got this baby top put together this afternoon. It was a quick project. Sure hope it makes some little kid smile.
I am quite proud of myself. I got this baby top put together this afternoon. It was a quick project. Sure hope it makes some little kid smile.